| For 748sf Model Home | Material ————————— ✔ included; X not included) | Labor —————————— ✔ included; X not included) | ||
|---|---|---|---|---|
| Architectural drawings , Structure, T24, On-site measurement,Communicate with city (we provide service ) | ✔ | ✔ | ||
| Demolish (拆除) | X | X | ||
| Survey | X | X | ||
| Civil Engineer | X | X | ||
| Soil Report | X | X | ||
| City Permit Fee | X | X | ||
| Slab foundation or Crawl Space | (over up to $30,000) client need pay any amount exceed | |||
| Steel Frame Rough Material | ||||
| 8’ Wall Framing Structure | ✔ | ✔ | ||
| Asphalt Shingles Roofing ****沥青瓦 30 years | ✔ | ✔ | ||
| Metal Roof 锌铝镁 屋顶高级建材 | X (Pay $20,000 to upgrade) | X | ||
| Roof Water Prove 屋顶防水 | ✔ | ✔ | ||
| Insulation 保温 Johns Manville | ✔ | ✔ | ||
| Exterior 外墙 cement sidding | ✔ | ✔ | ||
| Sheetrock 灰板 | ✔ | ✔ | ||
| Painting 油漆 home depot bear paint | ✔ | ✔ | ||
| Plumbing 水 (Inside Wall Only) copper & ABS | ✔ | ✔ | ||
| Electrical 电 (Inside Wall Only) MC cable | ✔ | ✔ | ||
| Exterior Door lights大门口路灯 x 2 | ✔ | ✔ | ||
| Below are Finish Material | Material Included | Labor Included | ||
| Exterior Door 大门 | x | ✔ | ||
| Kitchen cabinets 厨柜 | X | ✔ | ||
| Kitchen countertop 厨房台面 | X | ✔ | ||
| Refrigerator 冰箱 | X | ✔ | ||
| Dish Washer 洗碗机 | X | ✔ | ||
| Washer & Dryer 洗衣机 烘干机 | X | ✔ | ||
| Range Hood 抽油烟机 | X | ✔ | ||
| Bath Doors 卧室门 | X | ✔ | ||
| Bathroom vanity 卫生间厨柜 | X | ✔ | ||
| Sink faucet 洗手台水龙头 | X | ✔ | ||
| Bath Room Fan with lights 厕所排风扇 | X | ✔ | ||
| toilet 马桶 | X | ✔ | ||
| Bath Room Tower Rack 毛巾架 | X | ✔ | ||
| show set x 2rooms total | X | ✔ | ||
| Show set 水龙头 + 开关 | X | ✔ | ||
| Water Heater | X | ✔ | ||
| Bed Doors 卧室门 | X | ✔ | ||
| Laundry Room folding Door 门 | X | ✔ | ||
| Windows 窗 | X | ✔ | ||
| Flooring 地板 | X | ✔ | ||
| LED Lights | X | ✔ | ||
| Light Switches | X | ✔ | ||
| HVAC 暖通空调系统 | X | X | ||
| Other | Labor | |||
| Front Door Awning 大门雨棚 | X | X | ||
| Solar | X | X | ||
| landscaping (Any Area outside Foundation belongs to landscaping) | X | X | ||
| Site Plumbing Beyond the ADU Foundation Boundary | X | X | ||
| Electrical Wiring Beyond the ADU Foundation Boundary | X | X | ||
| Electrical panel upgrade 电箱升级 | X | X | ||

kitchen 厨柜

冰箱 30 in. W 20 cu. ft. Top Freezer Refrigerator w/ Multi-Air Flow and Reversible Door in Stainless Steel,ENERGY STAR
(cover up to $800, client pay any exceed $800)
厨房台面
Quartz Stone
洗碗机